PMHC Area 15 Pipeline & Pumpstation
Port Macquarie Hastings Council The construction of the sewer pump station and 3 km of rising main for the Camden Haven area. The infrastructure is required to service the approved 310 home sites future development located within the Camden Haven area. The works consisted of
Wallerawang Pipe Section Replacement
Client: Water NSW Installation of 276 m long OD 324 welded FBPE (Sintakote) SCL pipe-line including bridge crossing section Installation of 200 m long OD 324 FBPE (Sintakote) SCL RRJ pipeline Installation of all valves and fittings