Project Award by Central Coast Council
TCM have been awarded the Day St Watermain and Culvert Replacement for our client Central Coast Council. The culverts are located on a busy road and are required to be replaced with the water main to be relocated on piers crossing the creek. Significant effort will have to be made to minimize disruption to the […]
Southern Arm Trunk Main

Client: Port Macquarie-Hastings CouncilLocation: Houston Mitchell Drive, Lake Cathie, NSWProject Duration: January 2024 – October 2024 The Southern Arm Trunk Main project involves the installation of a 5.7 km DN750 Ductile Iron Cement Lined (DICL) water trunk main. This infrastructure upgrade includes the integration of air valves, scour valves, and isolation valves strategically placed along the road corridor […]
Sewer Pump Station GW05 Refurbishment

Client: Central Coast CouncilLocation: Gwandalan, NSWProject Duration: September 2023 – March 2024 Refurbishment of existing sewer pump station, including
Figtree Watermain Renewal Program

Client: Upper Hunter Shire CouncilLocation: Murrurundi, Scone and Merriwa NSWProject Duration: April 2023 – January 2024 Supply and Construction of a new DN100 to DN200 PVC-M / DICL Water Reticula-tion Main pipelines approximately 4.7 km in length across 11 different Sites within the Upper Hunter Shire Council LGA
GW02 Sewer Rising Main Partial Replacement

Client: Central Coast CouncilLocation: Gwandalan NSWProject Duration: August 2022 – April 2023 Replace 220 metres of DN375 Cement Lined Ductile Iron Pipe with DN355 PN16 PE100 Pipe by trenched and trenchless installation New Air Injection Pit complete with piping & valving and connecting to existing copper Air Injection Pipework New By-Pass Arrangement at the SPS