Client: Veolia Water Operations
Design and detail precast sleeper retaining wall at Toronto WWTP
Excavation and piering of galvanised posts, install precast concrete sleepers, backfill retaining wall
Minor grading works around the edge of the building to allow water to fall away from the structure
Three months post construction, resin injection to level the building slab