Pipeline Construction of the Quipolly Water Project

Client: Gongues Constructions Pty Ltd 3.6km of DN200 PVC-O 5.6km of DN250 PVC-O 6.3km of DN300 PVC-O 3km of DN375 DICL Installation mostly by open trenching of a new water transfer mains, as part of a larger project to provide new water supplies to the towns of Werris Creek and Quirindi. Works included connections and […]

Rosehill to Harden Pipeline Replacement

Client: Goldenfields Water 11 km of DICL pipe in nominal sizes of 450 and 500 mm and associated fit-tings. Two replacement sections, Harden (extent 3.72 km) and Jugiong (extent 7.30 km). Isolating pipe sections in the vicinity of high voltage power lines will comprise of GRP pipe.

Muswellbrook Pipe Renewal Program

Client: Muswellbrook Shire Council Installation of 1.2km of DN100 PVC-O Pipeline including fittings Installation of 220m of DN150 PVC-O Pipeline including fittings Installation of 90+ water services onto the new watermain and hot-tap installation on existing DN225 Cast Iron main Aerial crossing over existing culvert using DN150 DICL Flanged pipework In 2021, TCM Civil installed […]

PMHC Area 15 Pipeline & Pumpstation

Port Macquarie Hastings Council The construction of the sewer pump station and 3 km of rising main for the Camden Haven area. The infrastructure is required to service the approved 310 home sites future development located within the Camden Haven area. The works consisted of

Wallerawang Pipe Section Replacement

Client: Water NSW Installation of 276 m long OD 324 welded FBPE (Sintakote) SCL pipe-line including bridge crossing section Installation of 200 m long OD 324 FBPE (Sintakote) SCL RRJ pipeline Installation of all valves and fittings 

Cabonne SC Construction of Water Reticulation System

Client: Cabonne Shire Council Construction of Cumnock and Yeoval Water Reticulation Pipelines and Associated Structures. Reticulation main from Yeoval reservoir to Yeoval town, 0.96 km long DN200 PVC-M pipeline. Reticulation pipelines at various locations within Cumnock town. DN100 PVC-M pipes and have a total length of approximately 1.1 km. Reticulation pipelines at various locations within […]

Gunnedah to Curlewis Pipeline

Gunnedah Shire Council Two (2) potable water reservoirs (Approximately 500kL each). Design and construction of approximately 15.8 kilometres of DN200 PVC-O Series 2 PN16 pipelines https://www.nvi.com.au/story/5781122/curlewis-pipeline-project-97-per-cent-complete/ https://www.prime7.com.au/news/5279-curlewis-pipeline-in-last-phase-of-construction

Construction of Fish River Steel Pipeline

State Water Corporation Construction of 0.66 km long steel OD 914 – RRJ pipeline, 2.5 km long steel OD762 – RRJ pipeline, 0.6 km long steel OD762 welded pipeline, Scour valves, air valves and isolation valves, cross connections to Stage 1 and 3 pipelines (at two locations), Valve pits, thrust blocks, anchor blocks, supports, trench […]

Clarence Town Wastewater Transportation System

Hunter Water Corporation Completion of remaining works outstanding under terminated contract of former contractor for the construction of Clarence Town wastewater transportation system. Construction of sewer gravity system.Construction of 2 wastewater pump stationsConstruction of sewer rising mains. Many challenges were faced after the termination of the previous contractor. Community liaison was paramount to ensure the […]