Construction of Neath Watermain

Hunter Water Corporation Construction of 1,272m of 500mm DICL high pressure watermain.Construction of 66m of 300mm DICL watermain.

Veolia Amenities Building Remediation Toronto WWTP

Client: Veolia Water Operations Design and detail precast sleeper retaining wall at Toronto WWTP Excavation and piering of galvanised posts, install precast concrete sleepers, backfill retaining wall Minor grading works around the edge of the building to allow water to fall away from the structure Three months post construction, resin injection to level the building slab

Muswellbrook Supply & Installation of Water Distribution Points at Denman & Muswellbrook

Client: Muswellbrook Shire Council Install two water dispensing units to allow access to bulk water 24 hours per day 7 days per week from convenient locations at Muswellbrook and Denman. Excavation of concrete slab and kerb at Denman and construction of new pipeline for both sites into the proposed water units. Installation of ancillaries including […]

HWC Biosolids Storage

Hunter Water Corporation The construction of Biosolids storage areas at various Hunter Water Wastewater Treatment Works (WWTW) across the Hunter Region, including: Belmont, Morpeth, Boulder Bay, Raymond Terrace, Edgeworth, Toronto, Kurri Kurri, Cessnock and Karuah.

PMHC Area 15 Pipeline & Pumpstation

Port Macquarie Hastings Council The construction of the sewer pump station and 3 km of rising main for the Camden Haven area. The infrastructure is required to service the approved 310 home sites future development located within the Camden Haven area.The works consisted of