Walker St Warners Bay
Supply and Construct – 300 Dia SS Pipe Crossing and Aerial Creek Crossing.
Cessnock / Kurri Kurri WWTW Ponds Refurbishment
Hunter Water Australia Removal and transport of 7000 cu.m filter media from Kurri Kurri WWTW to Cessnock WWTW, placement of the filter media around the ponds at Cessnock WWTW and refurbishment of the nominated areas at Kurri Kurri WWTW. Demolition and restoration work for the refurbishment of the redundant filter beds at the Kurri Kurri […]
Waterlines
Eraring Power Station / SNK Supply and Construct – 3100m 280 Ø Poly, 2350m 160 Ø Poly and 2700m 110 Ø Poly.
Muswellbrook Design and Construction of Sewer Rising Main No.5
Client: Muswellbrook Shire Council Detailed design and construction of 1.2km of DN 300 PVC-O PN16/ DN 315 PE 100 PN16 sewer rising main
HWC CDU Network Upgrade – Delivery Bunds and Dosing Points
Client: Hunter Water Corporation Construction of delivery bunds and dosing points 11 Principal sites across the Hunter Region. Excavations and earthworks including access construction Demolition of any existing concrete structures and removal of rubble to approved waste facility. Supply and Install of concrete slab materials Concrete placement and finishing Supply and install of handrails Supply […]
Watermain Upgrade, Greenleaf Rd Kooragang Island
Hunter Water Corporation Supply and Construct – 540m 375Ø DICL.
Cessnock Treatment Works
Belmont 6 Rising Main Replacement – Stage 2
Hunter Water Corporation Construction of 1,024m replacement section of a sewage rising main (RM) consisting of a 750 mm diameter steel pipeline (DICL with SINTAKOTE finish. 720m aerial, 304m open trench 56 piles and headstocks