Cessnock / Kurri Kurri WWTW Ponds Refurbishment

Hunter Water Australia Removal and transport of 7000 cu.m filter media from Kurri Kurri WWTW to Cessnock WWTW, placement of the filter media around the ponds at Cessnock WWTW and refurbishment of the nominated areas at Kurri Kurri WWTW. Demolition and restoration work for the refurbishment of the redundant filter beds at the Kurri Kurri […]

Waterlines

Eraring Power Station / SNK Supply and Construct – 3100m 280 Ø Poly, 2350m 160 Ø Poly and 2700m 110 Ø Poly.

HWC CDU Network Upgrade – Delivery Bunds and Dosing Points

Client: Hunter Water Corporation Construction of delivery bunds and dosing points 11 Principal sites across the Hunter Region. Excavations and earthworks including access construction Demolition of any existing concrete structures and removal of rubble to approved waste facility. Supply and Install of concrete slab materials Concrete placement and finishing Supply and install of handrails Supply […]

Belmont 6 Rising Main Replacement – Stage 2

Hunter Water Corporation Construction of 1,024m replacement section of a sewage rising main (RM) consisting of a 750 mm diameter steel pipeline (DICL with SINTAKOTE finish. 720m aerial, 304m open trench 56 piles and headstocks