Construction of Fish River Steel Pipeline

State Water Corporation

Construction of 0.66 km long steel OD 914 – RRJ pipeline, 2.5 km long steel OD762 – RRJ pipeline, 0.6 km long steel OD762 welded pipeline, Scour valves, air valves and isolation valves, cross connections to Stage 1 and 3 pipelines (at two locations), Valve pits, thrust blocks, anchor blocks, supports, trench stops and bulkhead, end connection of new pipelines to existing Stage 2 pipeline (at four locations), 3 creek crossings. Pipeline grades exceeding 45%.

Working next to a high-pressure, live water main presented challenges to the project, as did the fragile ecosystem which was managed with erosion control measures and silt fencing as outlined in the construction environmental management plan.

Twenty six full days were lost to wet weather but the project was brought in on time and in budget.

Our Accreditations

TCM has achieved third party certification for our Business Management System which comprises of the International and Australian Standards in ISO 9001:2015 Quality Management Systems, ISO 45001:2018 Occupational Health and Safety Management Systems and ISO 14001:2015 Environmental Management Systems.

More Posts

Southern Arm Trunk Main

Client: Port Macquarie-Hastings CouncilLocation: Houston Mitchell Drive, Lake Cathie, NSWProject Duration: January 2024 – October 2024 The Southern Arm Trunk Main project involves the installation of a 5.7

Figtree Watermain Renewal Program

Client: Upper Hunter Shire CouncilLocation: Murrurundi, Scone and Merriwa NSWProject Duration: April 2023 – January 2024 Supply and Construction of a new DN100 to DN200 PVC-M / DICL

Send Us A Message